Automatic Frequency Restoration Reserve (aFRR) · DE
Probabilistic forecasts for German aFRR capacity prices, energy prices, and activated reserve power.
Specifications
- Product type
- Gate closure · 09:00 D−1
- Zone
- Resolution
- 4 h blocks
- Horizon
- D to D+7
- Outputs
- P10 · P50 · P90
- Unit
- €/MW/h
- Time zone
- Europe/Berlin
- Updates
- Get notified via webhooks →
- History
- Since 2026-10-17
- API ID
- afrr-capacity-price-de
Performance
- MAE (D+1, at gate closure)
- 1.1 €/MW/h
17–23 Nov
Error by delivery day · €/MW/h
08:55 · gate closure 08:00 07:00Backtests
- 5 minbefore gate closure · daily 08:55Oct 2025 – Nov 2026
Leaderboard
Compare forecasters by accuracy and contribution to the ensemble.
Probabilistic forecasts for German aFRR capacity prices, energy prices, and activated reserve power.
What is automatic Frequency Restoration Reserve (aFRR)?
Automatic Frequency Restoration Reserve, known in Germany as Sekundärregelleistung, is the second layer of balancing reserves in the European power system. After FCR, aFRR takes over to restore the system balance and bring the frequency back to its setpoint; it must be fully available within five minutes. Unlike FCR, aFRR is procured separately for the two directions: positive aFRR increases feed-in or reduces consumption when the system is short, negative aFRR does the opposite when the system is long.
German aFRR demand is procured by the four transmission system operators on regelleistung.net, the joint German platform for balancing services, in two linked markets. In the capacity market, providers are paid for holding reserve capacity available: positive and negative capacity is auctioned separately for six four-hour blocks per day, gate closure is at 09:00 on the day before delivery, and accepted bids are paid as bid. Through the ALPACA cooperation, the German capacity market is coupled with Austria and the Czech Republic. In the energy market, activated reserve is remunerated: balancing energy is offered in quarter-hourly products and activated via the European PICASSO platform at cross-border marginal prices. In October 2025, the Bundesnetzagentur approved additional quarter-hour products for the German aFRR and mFRR capacity markets (decision BK6-25-212). Following the introduction, providers can bid 15-minute products alongside the four-hour blocks; quarter-hour bids are combined into synthetic four-hour bids, so capacity is still awarded per four-hour block.
The provider landscape spans conventional plants, pumped hydro, aggregated flexibility, and a rapidly growing share of battery storage, whose fast response capabilities fit the aFRR requirements well.
Why aFRR forecasts are important
For flexible assets, aFRR capacity is a core revenue stream competing directly with wholesale trading. The capacity auction closes in the morning of the previous day, before the day-ahead auction clears, so operators of batteries, pumped hydro, and flexible generation must allocate capacity between aFRR and the wholesale markets without knowing either outcome. An accurate aFRR capacity price forecast, alongside forecasts for FCR and day-ahead prices, turns this allocation into a calculated cross-market position.
Because the capacity auction is pay-as-bid, providers earn their own bid price rather than a common clearing price, so knowing the price level at which bids are accepted is essential. Missing it is expensive in both directions: bidding too high means lost awards, bidding too low means holding capacity out of a lucrative wholesale day for a marginal aFRR payment. Energy prices and activation volumes then decide how much the awarded capacity actually earns and how strongly it cycles the asset.
Positive and negative: forecast separately
Positive and negative aFRR are procured in separate auctions with distinct price dynamics, and Telescope Energy treats them accordingly. Each direction is forecast by its own models and evaluated separately; neither direction is derived from the other.
This separation matters because the two directions respond to different market situations. Positive aFRR prices reflect the value of upward flexibility and are high when the system expects high residual load, low renewable feed-in, or scarce dispatchable capacity. Negative aFRR prices reflect the cost of absorbing surplus energy and spike in anticipated oversupply situations, such as high wind and solar feed-in meeting low loads.
How our forecasts work
Telescope Energy operates a collaborative forecasting platform. Our proprietary ensemble engine combines models developed by our research team with forecasts from independent expert forecasters. Each contributing model is continuously evaluated against realized results per product, and the ensembles weight individual signals by their recent performance.
Forecasts are delivered as probabilistic quantile forecasts, providing a median estimate (P50) together with lower (P10) and upper (P90) quantiles. In a market where the price distribution is heavy-tailed, knowing the plausible upside of a block is often worth more than just the point estimate.
aFRR capacity price forecasts cover each four-hour block up to D+7 and are updated regularly until the 09:00 gate closure. Their target is the German average capacity price per block and direction, i.e. the volume-weighted average price of accepted bids as published on regelleistung.net; the marginal (highest accepted) price lies above it. aFRR energy price and activation forecasts cover each quarter hour and are updated regularly up to shortly before each delivery period. The energy price target is the arithmetic quarter-hour mean of published PICASSO cross-border marginal prices for the 50Hertz control area. Activations represent German activated reserve power as quarter-hour means in MW.
Forecasts are delivered through the Telescope API and via webhooks, and forecasts for FCR capacity prices and mFRR capacity prices are available on the same platform.
What drives German aFRR prices?
The dominant driver of capacity prices is the opportunity cost of the marginal provider. Large anticipated day-ahead spreads pull flexible capacity toward arbitrage and raise aFRR prices, while calm wholesale days push capacity into the reserve market and compress them. Because the auction clears before the day-ahead market, these expectations are themselves forecasts, which adds a layer of anticipation to price formation.
System conditions shape the two directions asymmetrically, which creates a strong time-of-day pattern. Solar pushes thermal plants to minimum load around midday, so typically negative aFRR in the 12:00 to 16:00 block is the most valuable product, while overnight blocks clear far lower. For positive aFRR capacity on the other hand, the highest prices typically occur in the 16:00 to 20:00 block as residual load peaks.
Structural factors move the market over longer horizons: battery buildout adds supply pressure, conventional plants retire, procured volumes change with system needs, and product design evolves. According to regelleistung.net tender results, the German marginal capacity price for positive aFRR averaged 14.6 EUR/MW/h from January to mid October 2026, roughly half the 29.1 EUR/MW/h of the same period in 2025.
Energy prices and activations follow the real-time system balance. Forecast errors in wind, solar, and load, steep quarter-hour ramps, and the bids available across all PICASSO countries determine how much aFRR is activated and at what price, including occasional extreme prices during large imbalances.
Capturing anticipation effects, directional asymmetry, and structural change in probabilistic signals is what Telescope Energy’s ensembles of diverse, continuously benchmarked models are designed to do.
Forecast accuracy
Accuracy claims are easy to make and hard to verify, which is why Telescope Energy is built around transparency. Our forecast history and realized aFRR tender results are available free of charge via the Telescope API.
Our ensemble approach is designed for consistent accuracy across market regimes, including the situations where forecasts matter most: scarcity spikes, oversupply-driven jumps in negative aFRR, and shifts in the provider landscape.
Frequently asked questions
What does this forecast include?
The product provides P10, P50, and P90 forecasts for the positive and negative German average aFRR capacity price in EUR/MW per hour for each four-hour block up to D+7, as well as quarter-hourly forecasts for aFRR energy prices in EUR/MWh and mean activated reserve power in MW. Delivery days follow the Europe/Berlin time zone.
How often is the forecast updated?
Capacity price forecasts are updated regularly until the capacity auction closes at 09:00 on the day before delivery. Energy price and activation forecasts are updated regularly throughout the day, up to shortly before each quarter hour. With our Webhooks you always receive the most recent forecast.
How is the forecast delivered?
Forecasts are delivered through the Telescope API for integration into bidding and asset-optimization workflows. Simply request a pilot to evaluate the product with your own benchmark and use case.
What does the forecast cost?
Our forecast subscriptions are priced competitively and we offer free backtesting and trials. See our pricing page for more information.
free pilot
Test Telescope against the forecasts you use today.
We onboard selected energy market teams to test Telescope in real workflows. Access is free during the pilot, including API integration and onboarding support.
No setup fee, no monthly product fee and no automatic charges after the pilot.